ブック メーカー 凱旋門 賞 Kansai Electric Power -power with heart-

Corporate History

1950s

1951

May

Kansai Electric Power was established upon restructuring of power business.

Kansai Electric Power was established

1956

July

Construction of Kurobegawa No.4 ブック メーカー 凱旋門 賞 (Omachi route) begins

1957

 

Nuclear Power Department launched to start R&D on nuclear power

May

Fault fracture zone reached in Omachi Tunnel for building the Kurobegawa No.4 ブック メーカー 凱旋門 賞 (broken through in December)

1958

Feb.

Kurobegawa No.4 ブック メーカー 凱旋門 賞 Omachi Tunnel completed

1960s

1961

Mar.

Output of thermal facilities overtakes hydro facilities (marking shift to thermal)

Sep.

World's first balloon construct method used to set up power transmission line crossing the Naruto Strait

1963

June

Construction of Kurobegawa No.4 ブック メーカー 凱旋門 賞 finally completed after 7 grueling years

ブック メーカー 凱旋門 賞nstruction of Kurobegawa

1964

May

KEPCO's first pumped storage ブック メーカー 凱旋門 賞, the Mio ブック メーカー 凱旋門 賞, goes into operation (34MW; 1,500 kW added in December 1968)

1966

 

Summer peak power consumption tops winter peak for the first time (marking shift to summer peak consumption)

1968

Mar.

Himeji No.2 ブック メーカー 凱旋門 賞 Unit 4 goes into operation (450MW: all units 1,350MW), first two-stage heat recovery supercritical pressure system

1970s

1970

July

KEPCO's first nuclear power plant, Mihama Nuclear ブック メーカー 凱旋門 賞 Unit 1 goes into operation (340MW)

Mihama Nuclear ブック メーカー 凱旋門 賞

July

Japan's first recirculating pumped storage power plant, Kisenyama ブック メーカー 凱旋門 賞 Units 1 and 2 go into operation (233MW each)

Kisenyama ブック メーカー 凱旋門 賞

1973

Oct.

Himeji No.2 ブック メーカー 凱旋門 賞 Unit 5 goes into operation (600MW, total 1,950MW); computerized auto-heating, auto-pressurizing system adopted; thermal power facility boosted to 10,030MW)

1976

May

Construction completed on 500 kV Wakasa main transmission line (city side) and Nishi-Kyoto transfer substation, completing a 500 kV main transmission system, which goes ブック メーカー 凱旋門 賞 operaiton

1979

June

Himeji LNG terminal goes ブック メーカー 凱旋門 賞 operation

Himeji LNG terminal

1980s

1981

Apr.

First TQC system in power industry adopted

1984

Nov.

Received Deming Prize, a global quality award, given for the first time outside of manufacturing and architecture industries

Received Deming Prize, a global quality award

1987

 
Annual electricity sales volume exceeds 100 TWh

1989

Dec.

Primary dispatching center goes ブック メーカー 凱旋門 賞 full operation; central load dispatching center backup system established

1990s

1991

Feb.

Mihama Unit 2 steam generator tube rupture accident

1992

Mar.

Institute of Nuclear Safety System, Incorporated (INSS) established taking ブック メーカー 凱旋門 賞 lessons learned from Mihama Unit 2 accident

1995

Jan.

Great Hanshin-Awaji Earthquake hits; immediate power outage affects 2.6 million households, primarily in Hanshin area (2,836MW)
Emergency power transmission completed in 153 hours

Great Hanshin-Awaji Earthquake

Dec.

Electricity Enterprises Law revised for the first time in 31 years, deregulating the wholesale power industry

1996

Jan.

Electricity rates lowered, First electricity wholesale bidding

1998

Feb.

Electricity rates lowered

Oct.

First overseas power generation by a power company
Joined San Roque hydroelectric power generation project in the Philippines

San Roque hydroelectric power generation project in the Philippines

2000s

2000

Oct.

Electricity Enterprises Law revised; liberalization of retail market begins; first lowering of electricity rates by report

2001

Aug.

Record high peak power consumption (33,060MW)

Nov.

Heat pump water heater "EcoCute" with ブック メーカー 凱旋門 賞2 coolant developed

2002

Oct.

Electricity rates lowered

2003

June

Constant rated thermal power operation introduced at all nuclear power plants

July

KEPCO's electricity certified with EcoLeaf environmental label

Eブック メーカー 凱旋門 賞Leaf environmental label

2004

Aug.

Mihama Nuclear ブック メーカー 凱旋門 賞 Unit 3 secondary pipe rupture accident

Mihama Nuclear ブック メーカー 凱旋門 賞 Unit 3 seブック メーカー 凱旋門 賞ndary pipe rupture accident

Aug.

Maizuru ブック メーカー 凱旋門 賞 Unit 1 goes into operation
First cross-compound steam turbine adopted by KEPCO

Maizuru ブック メーカー 凱旋門 賞

2005

Apr.

Electricity rates lowered

June

Mihama Nuclear ブック メーカー 凱旋門 賞 Unit 3 accident recurrent prevention plan announced

2006

Apr.

Electricity rates lowered

2007

Mar.

Kansai Electric Power Group medium and long term plan announced

2008

Sept.

Electricity rates lowered

Sept.

Mihama Line Tower No.21 accident

Sept.

KEPCO's first company ship "LNG Ebisu" built

2009

July

Power usage notice and inquiry service started

2010s

2010

Mar.

Kansai Electric Power Group Long-term Growth Strategy toward 2030 announced

2011

Feb.

Winter peak power consumption record (26,650MW)

Sept.

Japan's first megasolar project by a power company Sakai Solar ブック メーカー 凱旋門 賞 goes into full operation

Sakai Solar ブック メーカー 凱旋門 賞

2012

Dec.

Awaji Wind ブック メーカー 凱旋門 賞, the first KEPCO's wind farm, goes into operation

Awaji Wind ブック メーカー 凱旋門 賞

2013

May

Electricity rates raised

Aug.

Himeji No.2 ブック メーカー 凱旋門 賞 Unit 1 goes into operation
Facility upgraded to combined cycle power generation system using ultra high-temperature 1,600 degrees C -class gas turbine

Himeji No.2 ブック メーカー 凱旋門 賞

2015

June

Electricity rates raised
Leading Company in Osaka-City Supporting Women's Activities certified

2016

Mar.

Leading Company in Osaka-City Supporting Women's Activities awarded for excellence
Management Philosophy, Guidelines for Action, Kansai Electric Power Group Vision and brand statement drafted

Apr.

Liberalization of the energy retail market begins

Kansai Electric Power Group Medium term Management Plan (2016-2018) drafted

2020s

2020

Feb.

Kansai Electric Power Group “Zero Carbon Vision 2050” drafted

Mar.

Corporate Purpose & Values and Kansai Electric Power Group Medium-term Management Plan(2021-2025) drafted

Related sites