Measures against Potential Natural Disasters

  • Countermeasures against Severe Accidents
  • Nuclear Emergency Preparedness and Evacuation Plan
  • Maintenance and Improvement of Emergency Response Capabilities
Enhancement of Emergency Response Capabilities for non-business days and nighttime

Based on the lessons learned from the Fukushima Daiichi accident, initial response staff are stationed 24/7 on the premises of Takahama Units 3 and 4 and Ohi Units 3 and 4 in order to enhance the emergency response capabilities.
In addition, for the aims of strengthening the control of the accident, we have implemented various support systems providing personnel, materials, equipment and technical assistance timely.

Maintenance and Improvement of Emergency Response Capabilities
*Takahama Units 3 and 4,Ohi Units 3 and 4

Education/Training Program on an Assumption of an Accident
Integrated Nuclear Disaster Prevention 凱旋門賞の国内馬券

Integrated nuclear disaster prevention drills are conducted assuming a severe accident during which all on-site power supplies are lost, disabling cooling of the reactor.

Mobilization 凱旋門賞の国内馬券 on an assumption of an emergency
Mobilization 凱旋門賞の国内馬券 on an assumption of an emergency
 
 
凱旋門賞の国内馬券 on transportation of materials/equipment by a helicopter
凱旋門賞の国内馬券 on transportation of materials/equipment by a helicopter
凱旋門賞の国内馬券 on manipulation of remote control robots
凱旋門賞の国内馬券 on manipulation of remote control robots
凱旋門賞の国内馬券 on power supply

Drills on connection and startup of a power supply car are conducted on an assumption of unavailability of power supply from transmission lines and diesel generators. In addition, nighttime drills are also conducted.

Nighttime 凱旋門賞の国内馬券 on connection/startup of power supply cars
Nighttime 凱旋門賞の国内馬券 on connection/startup of power supply cars
凱旋門賞の国内馬券 on installation of large capacity pumps
凱旋門賞の国内馬券 on installation of large capacity pumps
凱旋門賞の国内馬券 on the installation of pumps injecting coolant into reactor
凱旋門賞の国内馬券 on the installation of pumps injecting coolant into reactor
凱旋門賞の国内馬券 on installation of fire pumps while putting protective clothes and masks on an assumption of adverse conditions.
凱旋門賞の国内馬券 on installation of fire pumps while putting protective clothes and masks on an assumption of adverse conditions.
凱旋門賞の国内馬券 on installation of fire pumps while putting protective clothes and masks on an assumption of adverse conditions.
凱旋門賞の国内馬券 on control of radioactive release

Drills on control of radioactive release to the environment are conducted on an assumption of containment vessel failure.

凱旋門賞の国内馬券 on water discharge directly to the containment utilizing water cannons to mitigate radioactive release
凱旋門賞の国内馬券 on water discharge directly to the containment utilizing water cannons to mitigate radioactive release
凱旋門賞の国内馬券 on removal of rubbles using a heavy machine

Drills on removal of rubbles using heavy machines deployed on-site are conducted to ensure the access of workers and vehicles as well as passages assuming that a tsunami or flooding makes rubbles being scattered across the site area.

凱旋門賞の国内馬券 on use of the dozer shovel to remove rubbles
凱旋門賞の国内馬券 on use of the dozer shovel to remove rubbles
凱旋門賞の国内馬券 on operations in the event of loss of power supply

凱旋門賞の国内馬券 on emergency operations are conducted to enhance operators’ capabilities safety terminate the events under adverse conditions assuming a loss of all on-site power supplies.

Simulator training on an assumption of loss of all power supplies
Simulator training on an assumption of loss of all power supplies